Fixing The Field -- Two Decades In The Making

Fixing The Field -- Two Decades In The Making

By Sade Malloy

Yakima -- The Selah High School field will be getting a makeover Monday.

Besides having little seating and no track, the Superintendent says the field is missing a layer of top soil, that means the field doesn't drain.

The school district is dishing out $70,000 for the top soil.
This content requires the latest Adobe Flash Player and a browser with JavaScript enabled. Click here for a free download of the latest Adobe Flash Player.
Icon
Current Temp 78 °F
Partly Cloudy
More Weather

Resources and info you need to prepare for the switch to DTV.

Stay Connected

Viewer Poll

What are you doing to celebrate Independence Day?

  • Staying home and staying cool.
  • Taking a little road trip with the fam.
  • Fireworks. Lots of fireworks.
  • The only American thing to do: bar-b-que!