July 5, 2008
- Yakima, Washington 29
Fixing The Field -- Two Decades In The Making
By Sade Malloy
Yakima -- The Selah High School field will be getting a makeover Monday.
Besides having little seating and no track, the Superintendent says the field is missing a layer of top soil, that means the field doesn't drain. The school district is dishing out $70,000 for the top soil. |
This content requires the latest Adobe Flash Player and a browser with JavaScript enabled.
Click here for a free download of the latest Adobe Flash Player.
Catch up with your favorite shows online. Stay Connected |
Connect with KIMAViewer PollMost Popular
|
You
